The Pile Drilling Rig is a high-performance foundation construction machine widely used in solar photovoltaic pile installation and infrastructure foundation works.
It integrates multiple working methods including drilling, ramming, and screwing, allowing flexible adaptation to different geological conditions such as sand, clay, gravel, and mixed soil layers.
With a powerful hydraulic system and reinforced structural design, the machine ensures stable operation, accurate pile positioning, and high construction efficiency.
This equipment is widely used in large-scale solar farms and foundation projects where speed, precision, and reliability are critical.
The Pile Drilling Rig is a high-performance foundation construction machine widely used in solar photovoltaic pile installation and infrastructure foundation works.
It integrates multiple working methods including drilling, ramming, and screwing, allowing flexible adaptation to different geological conditions such as sand, clay, gravel, and mixed soil layers.
With a powerful hydraulic system and reinforced structural design, the machine ensures stable operation, accurate pile positioning, and high construction efficiency.
This equipment is widely used in large-scale solar farms and foundation projects where speed, precision, and reliability are critical.
| Model | YG-330 | YG-360 | YG-680F |
| Max Pile Length | 3 m | 6 m | 30 m |
| Max Diameter | 220 mm | 300 mm | 400 mm |
| Working Mode | Drilling / Ramming / Screwing | Drilling / Ramming / Screwing | Drilling / Ramming / Screwing |
| Engine Power | 37 kW | 37 kW | 85 kW |
| Hydraulic System | Standard | Enhanced | Heavy-duty |
| Applicable Soil | Soft soil | Mixed soil | Hard & complex soil |
| Transport Size | Compact | Compact | Large frame |

Global Strategic Layout
01
Honors & Certifications
02
Technology Awards
03
Technological Innovation
04
Get drilling rig product configuration parameters
Get a pricing plan suitable for your team size